Publication

Plan to take the project to an indexed journal: three target journals, expert round table, 10–30 year turn date and weekly route.

From project to indexed journal

Plan agreed by a six-model round table on the author's 27-journal report, web-verified on 20 November 2026. Nothing here certifies submission, acceptance or approval: Javier records those facts.

Target submission

—

January 15, 2027

Submission cap

—

January 31, 2027

Plan progress

61 %

14 / 23 tasks

Human blockers

3

examiners’ recommendations

Manuscript: When will a priority date become current? Reference-class and series-specific first-passage forecasts of U.S. Visa Bulletin cutoffs Read the web version of the article

Where acceptance is most likely

The journal accepting the submission is enough, and only an APC of up to USD 1,000 is paid. One cascade, never simultaneous submissions: AJSE, then Computación y Sistemas, then Inteligencia Artificial, all three at no cost.

Index:
Scopus + WoS SCIE · JCR Q2 Multidisciplinary
Cost:
$0 via the subscription route
Speed:
~53 % published within 6 months (Editage, 2022)
When:
First choice: no cost, and the programme already accepted a submission here.

Direct UACJ precedent: a classmate met the requirement with a manuscript submitted here (Sep 2026), also a comparison where the simple model beats deep learning.

“Out of scope”: submit to Computer Engineering & Computer Science, lead with the method (first passage under censoring) and frame the bulletin as a testbed.

2

Computación y Sistemas

IPN · CIC (México)

Index:
Scopus + JCR (IF 0.8) · SciELO · SECIHTI SNPCyH 2026
Cost:
$0 · diamond open access
Speed:
No published times: audit received/accepted dates
When:
Second choice after an AJSE desk rejection; Spanish or English.

Meets any plausible definition of “indexed” (Scopus, JCR and the national registry) at no cost, and knows the MICAI community.

“Incremental contribution”: do not sell a 24-model comparison; sell a calibrated waiting-time estimator.

Index:
Scopus + WoS ESCI · JIF 2025 0.9
Cost:
$0 · diamond open access
Speed:
No published times: audit recent issues
When:
Third choice; accepts Spanish, English and Portuguese.

Ibero-American applied-AI journal indexed in Scopus and Web of Science, at no cost.

“Little AI novelty”: highlight the probabilistic evaluation under censoring and the predictability horizon.

Backups

  • Applied Intelligence (Springer) · SCIE Q2 · $0 subscription
  • Papeles de Población (UAEMéx) · SNPCyH · $0 · human English translation if accepted
  • Migraciones Internacionales (El Colef) · Scopus + SNPCyH · $0 · only with a migration framing

Ruled out

  • Forecasting (MDPI): APC CHF 1,800, above the USD 1,000 cap.
  • IEEE Access and Data in Brief: APC above USD 1,000.
  • International Journal of Forecasting: ~15 % acceptance and close to a year of review.
  • Estudios Fronterizos: closed to submissions as of 20 Nov 2026.
  • Research in Computing Science: outside Scopus and the SNPCyH registry.
  • MICAI and COMIA: conferences (LNCS/CCIS), not journals.

Six models, two rounds, one plan

Each expert answered independently, then voted on a common proposal. They agreed on one calibrated first-passage manuscript and on not selling 30-year dates as validated forecasts.

ExpertVoteKey correction
Opus
Claude Opus 5.5
A–D, F, G agree · E trim scopeThe headline figure is the Brier skill score versus climatology by horizon, with the crossover marked.
Fable
Claude Fable 5.2
Agree except “validated to 15 years”Validated horizon ≤ 5 years; 5–15 years documented decaying skill; rolling conformal and cluster bootstrap.
Sol
GPT-6.1 Sol
Agree · objects to B and EAudit label availability in time: calibrate only with outcomes already observed at each origin.
Hydrogen
Gemini 4 Hydrogen
Agree · objects to ECensoring-weighted calibration (IPCW) and shrinkage toward climatology before adding models.
AGY
Gemini 4 Neon
Agree · objects to B, C and EIf “submitted” suffices, AJSE is #1 even with APC funding; validated horizon of 5 to 8 years and censoring-aware calibration.
Grok
Grok 4.7
Agree · objects to B, C, E and FWithout APC, Computación y Sistemas before AJSE; every band beyond 5 years is labelled “uncalibrated scenario”; 31 January is a cap, not a target.

When will my priority date become current?

First-passage time: thousands of cutoff paths are simulated from blocks of the series' own history and the month they reach the date is recorded. Evaluation on 73 series, origins scored from 2008, using only outcomes already observed and information available at each origin; lower Brier is better.

HorizonCasesSeries simulationBlendLinear velocityReference class
1 year3,8750.0660.0640.0940.065
3 years2,9600.1030.0980.1560.103
5 years1,9950.1130.1040.2000.112
10 years1,4700.136—0.254—
15 years5650.128—0.218—

Honest reading: the hard reference is not linear velocity (which loses at every horizon, with intervals entirely below zero: −0.440 at 1 year, −0.517 at 3 and −0.786 at 5) but the reference class, i.e. how often equal gaps were covered in the past. Simulating only the series' own history does not beat it, and blending both adds little: the blend's skill against the reference is +0.028 at 1 year, +0.053 at 3 years and +0.065 at 5 years, positive in every sensitivity analysis but with intervals that always include zero. Read the other way, the upper 95% limits of those intervals bound the gain: 0.089 at 1 year, 0.146 at 3 years and 0.166 at 5 years (approximate, pointwise limits for this panel, not a general limit). The reference class of past gaps is the forecast to beat. At 10 and 15 years there is not enough history to build that reference without leakage: there the simulation is only compared with linear velocity and published as a scenario, with the probability of waiting more than 30 years.

Week by week to acceptance

Each phase has a definition of done. Amber tasks depend on Javier and block the final journal choice.

  1. P0 · Research and consensus

    Sem 0 · 20-nov
    • DoneP0.1 Validate the 27-journal report and extend it (data journals, SNPCyH registry, AJSE)
    • DoneP0.2 Six-model round table, two rounds, consensus record
    • DoneP0.3 First-passage prototype with censored backtest on the real panel
  2. P1 · Human gates (block everything else)

    Sem 1 · 23–29 nov
    • DoneP1.1 Rule confirmed by Javier: the journal accepting the submission is enough; APC only if under USD 1,001
    • Needs JavierP1.2 Transcribe the Summit examiners' recommendations and map them to changes
    • DoneP1.3 Authors: Javier Rebull (first author) and Dr. Vicente García Jiménez (corresponding); journal #1 AJSE
  3. P2 · Calibrated first-passage estimator

    Sem 2–5 · dic
    • DoneP2.1 Fiscal-year-aligned block bootstrap; C and U months as states
    • DoneP2.2 Rolling conformal using only outcomes available at each origin (no temporal leakage)
    • DoneP2.3 Reference by gap pooled over all series (stratified by category type as secondary), rolling blend and two-way queue × year bootstrap
    • DoneP2.4 Baselines: deterministic velocity, random walk with drift, climatology; cluster-bootstrap CIs
    • DoneP2.5 Semi-Markov and quota accounting left out of this version (future work), per the record
  4. P3 · Open data and figures

    Sem 6–8 · ene
    • Needs JavierP3.1 Panel and code in a public repository with DOI (deposited by Javier)
    • DoneP3.2 Headline figure: Brier skill score vs climatology by horizon; reliability by K; survival curves per series
    • PlannedP3.3 Week-8 go/no-go: if 10-year coverage cannot be recalibrated, trim the claim
  5. P4 · Manuscript

    Sem 6–9 · ene
    • DoneP4.1 English skeleton with abstract, contributions and IMRaD structure
    • DoneP4.2 Chosen journal's template, cover letter and suggested reviewers
    • DoneP4.3 Similarity < 15 % against the MICAI and COMIA drafts; conferences frozen
    • Needs JavierP4.4 Review by Dr. Vicente and confirmation of conflict-free reviewers
  6. P5 · Submission

    ≤ 31-ene-2027
    • PlannedP5.1 Submit to journal #1 and file the manuscript number
    • PlannedP5.2 Backup package pre-formatted to resubmit within 7 days after a rejection
  7. P6 · Review and acceptance

    Feb–may 2027
    • PlannedP6.1 Point-by-point response within 10 days per round
    • PlannedP6.2 Integrate the estimator into the site and VisaBot (only once sealed)
    • PlannedP6.3 Submission record with manuscript number into the graduation file

What kills the publication

And how each one is neutralised.

Desk rejection (the submission is not accepted)

AJSE computing section, a cover letter that leads with the method, official template and journal checklist; backup ready to resubmit within 7 days.

Overpromising the 20–30 year date

Skill claimed only where climatology is beaten; beyond that, labelled scenario and P(> 30 years).

The editorial clock

Submission by 31 Jan 2027, pre-formatted backup and only one manuscript under review.

Redundancy with MICAI/COMIA

New text, cross-citations and conferences paused while the journal decides.